Aug 30, 2011

Untitled Thought

My enjoyment of the Highlander series is tempered by the knowledge that it inspired a fair few pretentious gits to claim to be Scottish and collect swords for pretentious-git purposes (as opposed to collecting them because swords are cool, which is separate from collecting them because you want to swear up and down that the jewelry you got at Spencer’s and the blades you bought at a flea market are mystical). Similar things have happened with Star Wars and Lord of the Rings.
I've come to the conclusion that basing a major life philosophy or the bulk of your religion on fantasy movies is like saying that ill-thought-out beliefs are a competition, and by God you're going to beat EVERYONE.

1 retaliatory rant(s):

Spam will be deleted on the basis that anyone who would actually fall for that crap probably shouldn't be allowed to use a computer.